一起草av_日韩av在线电影_在线91_成人黄色在线视频_啦啦啦免费高清视频在线观看_欧美精品综合_欧美色综合网_欧美成人黄色_台湾佬美性中文娱乐网_五月综合激情日本mⅴ_操出白浆视频_欧美高清性_无码人妻精品一区二区50_国产精品毛片一区二区三区_一区二区国产在线_日本少妇吞精囗交_久久9热_欧美熟妇乱码在线一区

聯系電話 : 13777223589

Matters needing attention when installing cable and drag chain

發布時間:2020-08-18 10:58:00 瀏覽次數:1229

1. Cables shall not be twisted when laying and shall not be unwound from either end of the drum or cable tray. Instead, the cable shall be unfolded by rotating the drum or cable tray first, and the cable may be unfolded or hung up if necessary.Cables used for this purpose can only be obtained directly from the cable coil.

2. Note the minimum bending radius of the cable.

3. Cables must be laid side by side, loosely in the trailing chain, as far apart as possible, separated by spacers or inserted into the separation voids in the empty brackets of the supports. The voids between cables in the trailing chain shall be at least 10% of the cable diameter

4. Cables in the tow chain shall not touch or get stuck together.

5. The cable must be fixed at both points, or at least at the moving end of the drag chain.Generally, the distance between the moving point of the cable and the end of the tow chain should be 20-30 times of the diameter of the cable.

6. Make sure that the cable moves completely within the bending radius, that is, it cannot be forced to move.

Understanding these knowledge, in the daily installation, use process can effectively avoid the damage of the cable and drag chain, prolong the service life.

上一條:none!
下一條:none!